Renovating the studio – part 16

The rest of the torch felt was installed today; the bits that deflect the rain away from the sides and back of the workshop. The rear elevation was also shielded in a way that would ensure no pooling water against the back wall. A leak test was also done, to check that the Velux was sealed in properly.

Tomorrow’s work should include the solar paint, and sand/cement in a few places.