With the skim coat finally a consistent colour, I was able to get two base coats and a soft sheen coat on. Good thing I mentioned what I was doing to the guy at the local hardware store, otherwise I
Renovating the studio – parts 24 and 25

With the skim coat finally a consistent colour, I was able to get two base coats and a soft sheen coat on. Good thing I mentioned what I was doing to the guy at the local hardware store, otherwise I
Well, the builder is finished, and it’s now a case of waiting for the light fixtures to arrive so the sparky can install them.
Today’s work was the skimming of the workshop, and dealing with a crack in the wall outside the bathroom. The crack in the wall outside of the bathroom looked like it might go all the way through the wall (as
Today was the last of the boards going up, and the near-final measurements of the workshop are in – 2.25m x 4.7m x ~2.2m (mid-point of sloped ceiling). Drain channel was mostly dug out too. Boarding out was slower today,
Not too much done today; the scratch coat was still too damp, so it’s being left until Tuesday before boarding out the walls. Solar paint is on, doorstep is cast, and all the guttering at the front of the house
Roof insulation went in today, ceiling was boarded out, interior walls were scratch coated, and gutter was put up. The intent was acoustic insulation, but it was unavailable in the thickness desired, so regular rock wool was installed instead. Other