Today was a slow day, with the shutters for the foundation getting fixed in place, the damp-proofing sheet being laid down, and the insulation for the floor. Concrete truck should arrive tomorrow to do the pour, and then it’ll be home time for Michael and Sid.
Renovating the studio: part 4
Tags: