It’s a kitchen!

The kitchen has been installed, bar two doors – one for the dry goods cupboard (at least, that’s the current intent for it), and the fridge.

The install took two days, with the main run going in on Monday, and the “dry” wall units going in on Tuesday.

The fitter was a fairly tidy worker, sweeping and vacuuming as he went. I found a few bits he’d missed at the end, but it was minor. The fitter was supplied by Cash & Carry Kitchens, a gent called John Boyle.