Stripped kitchen, stripping ensuite

Progress of sorts. Kitchen wet wall has been stripped back to the bare concrete blocks. It looks like the plaster and insulation might have been resting directly on soil instead of on a waterproof base – will be confirming that today with the builder. A bit of archaeology says that I’ve got an engineered wood floor, a concrete floor, and 2 different tile floors, and the waterproofing membrane under the wood/concrete floor wasn’t extended to behind the wall covering layers…

The stripping of the ensuite has started too, with discoveries of copper pipes that have been squished, mould all behind the toilet, and signs that the Saniflow was on the way out.