Progress of sorts. Kitchen wet wall has been stripped back to the bare concrete blocks. It looks like the plaster and insulation might have been resting directly on soil instead of on a waterproof base – will be confirming that today with the builder. A bit of archaeology says that I’ve got an engineered wood floor, a concrete floor, and 2 different tile floors, and the waterproofing membrane under the wood/concrete floor wasn’t extended to behind the wall covering layers…

A new pile appears! 
They had trouble with the Saniflow… 
Stripped back wall; no scratch coat 
The old vent slot, and starting to drill for a new electro-mechanical vent 
More of the kitchen wall 
A backbox from in the kitchen 
Totally rusty backbox 
Some of the plasterboard paper 
The gap between the wall and the flooring 
Looks like damp earth down there
The stripping of the ensuite has started too, with discoveries of copper pipes that have been squished, mould all behind the toilet, and signs that the Saniflow was on the way out.

The old Saniflow. 
Pretty sure the Saniflow shouldn’t be this black 
The old shower door, next to the boxed flue 
Behind the Saniflow/toilet 
Starting the demolition 
The copper pipe is squished 
No or little grout between the tiles, so not sealed 
Walls drying 
Wall drying with scratch coat, pipes getting removed