Over the last week or so, the electrician has been taking up floorboards and getting holes knocked into walls; a standard skip arrived, got filled, and was removed; the builder finished boarding out the ceiling under the back bedroom, and has started skimming.
On the note of the skimming – this guy is good; the skim is so smooth fingers glide over it, and if you look along it, it’s reflective. It’s an incredibly good skimming job.

More stuff moved; BESTA bits, not sure where they’ll go 
This is the inside of the old water tank.. ewww 
Old floor waiting to go in the skip 
I can see the corner again! 
New joists with OSB flooring 
A crooked view of the plasterboard-covered stairwell top 
Sand and cement render over the walls 
The boxing in the bedroom, with electrical cable punched through 
A temporary rats nest in the kitchen 
Boarding over all the opened up bits 
Boarded over ceiling 
More wires appearing at the consumer unit 
The wall.. is not true 
More record keeping of where all the mechanical fixings are 
Fully boarded out beam 
The skim coat 
The reflective skim coat 
Ceiling covered, and looking less curved 
Tidying up in the kitchen 
Taking up for wiring in the third bedroom 
That pipe is the outflow from the Saniflow ensuite 
It goes along the boxing 
I can see the floor of the kitchen! 
The living room/kitchen wall, drying 
Another view.