Porch slab is laid, front door is back in place where it should be, and some more of the existing plasterboard has been removed to expose pipes and where to run the network cable. The plasterboard on the underside of the stairs has also been removed – not sure what for.
The porch slab, with DPC Underside of stairs, looks in decent condition Network cabling laid in, pipes exposed. The pliers that were in the porch wall. They’re going to get framed.
Small progress