Month: May 2019

  • Balcony replaced, more skimming

    Balcony replaced, more skimming

    The old balcony material has been removed completely, the joist next to the RSJ was lifted out long enough to get the RSJ fully painted, and a new marine plywood surface has been put in ready for torch felting. The builder and roofer noted that there was no proper angling of the felt in front…

  • New hallway joists, changing the balcony

    New hallway joists, changing the balcony

    The hallway joists have been replaced, and some lovely rotten timber was removed. The hallway has also been leveled to match the master bedroom, and it’s a pretty incredible 8 cm drop over 2 metres of run. The bits for the balcony have also been taken up, and it’s evident that there’s pooling on the…

  • Double rainbow sunset Sunday

    Double rainbow sunset Sunday

    Just a nice evening.

  • Weather front

    Weather front

  • Running a new bilge pump pipe

    Running a new bilge pump pipe

    The existing pipe for Blue Opal’s electric bilge pump is some sanitation hose that looks like it might have been installed when the boat was built. I’ve been getting odd bits of water in the bilge that can’t be explained by leaks in the stern or at the mast, so I decided to clean and…

  • Pull-handle for the water tank locker

    Pull-handle for the water tank locker

    Blue Opal’s water tanks are in the bow, under the master cabin berths. The boards that cover the lockers are a pain to remove, because they’re a friction fit. However, given there are two shut-off valves in the locker, I decided to make it a bit easier to get the locker boards up. Having experienced…