  • The saga of doom continues

    The saga of doom continues

    Ensuite The third bedroom has been stripped and re-rendered with sand/cement scratch. When this was happening, some tiles fell off the wall in the ensuite bathroom, revealing that behind the tiling is black mould of some sort. How it’s growing behind the tiles is beyond me. The Saniflow macerator also decided to have conniptions, leaking…

  • Every single time I think weโ€™re making progressโ€ฆ

    Every single time I think we’re making progress…

    Well, we are making progress on the house, but it feels like backwards progress some days. After looking at the back wall of the second bedroom on Friday gone, I told the builder to strip it back and thermal board it. Like other walls, it was covered in 20 – 30 mm of gypsum. Post-stripping,…