The new boiler is in – a Worcester Bosch Ri. Guy showed up at 0810, and worked through to about 1400. Network cable was piped in properly this time (instead of my hack), new flue (plastic instead of metal) has
Boiler replaced

The new boiler is in – a Worcester Bosch Ri. Guy showed up at 0810, and worked through to about 1400. Network cable was piped in properly this time (instead of my hack), new flue (plastic instead of metal) has
At the end of December, the soil stack at the back of the house clogged again. It turns out whoever installed the guttering down pipe did a shit job (pardon the pun), because they never flush-trimmed the down pipe where