Skip to content
Cricalix.Net

Cricalix.Net

Licking crixes

Menu

  • Blue Opal
    • Boat Projects
    • Manuals
  • Bookmarks
  • Code
  • Photography
  • Recipes
    • Bajan beef stew
    • Macaroni pie
    • Salt fish cakes
    • Bajan seasoning
    • Pumpkin fritters
    • Banana bread
    • Rock cakes

Day: 2019-03-23

Step done, patio done

Step done, patio done

The front step has been cast, and the kitchen patio has been finished. I’ve checked the slope/run, and it’s good – the water runs into the drains for the most part. There’s a bit of the upper garden, right next

Duncan 2019-03-232019-03-23 Property Read more

Archives

Categories

Recent Posts

  • A foggy day in Dun Laoghaire
  • Facebook export – Bits to Fix: 2012/2013
  • Colour-cycling a Christmas Star
  • Eir F3000 (F@st 5366) – bridge mode
  • Boiler replaced

Tags

$work 42 Aslana autohelm Avatar barbados bequia Blue Opal boiler Code construction Cooking damp demolition DMYC Dun Laoghaire eir electrics electronics freeswitch Gaming Gardening grenadines grenadines2009 holiday House Housegate Ireland leathercraft lisbon maintenance muppets PBX petit st vincent Photography python Reviews sunrise sunset Technology tobago cays Travel ubercon visual basic wayback machine
Copyright © 2021 Cricalix.Net. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.
  • Blue Opal on Facebook