Skip to content
Cricalix.Net

Cricalix.Net

Licking crixes

Menu

  • Blue Opal
    • Boat Projects
    • Manuals
  • Bookmarks
  • Code
  • Photography
  • Recipes
    • Bajan beef stew
    • Macaroni pie
    • Salt fish cakes
    • Bajan seasoning
    • Pumpkin fritters
    • Banana bread
    • Rock cakes

Day: 2019-03-21

Tanked walls, new joists.. what goes wrong next?

Tanked walls, new joists.. what goes wrong next?

The tradesmen have made really good progress today. The boxing for the stairwell is completed, the pipes have been run through it, ready for skinning over, the new joists are in place, the porch walls have been tanked, and the

Duncan 2019-03-212019-03-21 Property Read more

Archives

Categories

Recent Posts

  • A foggy day in Dun Laoghaire
  • Facebook export – Bits to Fix: 2012/2013
  • Colour-cycling a Christmas Star
  • Eir F3000 (F@st 5366) – bridge mode
  • Boiler replaced

Tags

$work 42 Aslana autohelm Avatar barbados bequia Blue Opal boiler Code construction Cooking damp demolition DMYC Dun Laoghaire eir electrics electronics freeswitch Gaming Gardening grenadines grenadines2009 holiday House Housegate Ireland leathercraft lisbon maintenance muppets PBX petit st vincent Photography python Reviews sunrise sunset Technology tobago cays Travel ubercon visual basic wayback machine
Copyright © 2021 Cricalix.Net. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.
  • Blue Opal on Facebook