Left the property at 9 am after talking to the builder, fireplace guy, and plumber/gas guys. Told the builder what was ok in terms of holes cut into walls etc, and left them to it. The drain path for the
It’s amazing what can be done in a day

Left the property at 9 am after talking to the builder, fireplace guy, and plumber/gas guys. Told the builder what was ok in terms of holes cut into walls etc, and left them to it. The drain path for the
The top concrete slab has been removed; in places, it looks like it was on sand that had been coloured with cement, and in other places it was actually closer to the 3:1 mix that it should have been. Two